Whew, finally. We get to constructing the cabin walls. This is the fun part for me. As a former carpenter, framing construction is well-within my comfort zone.

Initially, it looked like it would be easy as pie. I planned to simplify the standard stud construction to reduce weight: (single) sole plate + studs + (single) top plate + simplified door and window openings.

But as I started planning out the end walls, I realized I needed access to the space under the decks, and so the end walls had to work around that.

The side walls were a little simpler and more conventional.

I was using all recycled Doug Fir 2x4s from the salvage pile at the dump, ripped from 3-1/2 inches to 3 inches.

Looking one more time at my wall detail, you see that the coaming (labeled "edgeboard") is cut into the wall studs. So I had to dado a sizable groove into each of my studs to accept the coaming.
Real woodworkers have tools for this, but I had to resort to some deft skillsaw work. And without a working wood chisel, I was sadly using a flat head screwdriver. Embarrassing. But it worked reasonably well.


Next, I assembled the walls on the floor of the barn, and then awkwardly personhandled them solo into place in the boat. Every connection was adhered with construction adhesive and nailed.


In the boat, the wall framing was glued and screwed.

Two walls.

Three.

With window framing and blocking added.

And finally four finished walls. In this last photo, you can see the doorframe to the head on the right.
A big day, for sure. Time for a cigar. Next up, more mistakes were made.
Read More..

Initially, it looked like it would be easy as pie. I planned to simplify the standard stud construction to reduce weight: (single) sole plate + studs + (single) top plate + simplified door and window openings.
But as I started planning out the end walls, I realized I needed access to the space under the decks, and so the end walls had to work around that.
The side walls were a little simpler and more conventional.
I was using all recycled Doug Fir 2x4s from the salvage pile at the dump, ripped from 3-1/2 inches to 3 inches.

Looking one more time at my wall detail, you see that the coaming (labeled "edgeboard") is cut into the wall studs. So I had to dado a sizable groove into each of my studs to accept the coaming.
Real woodworkers have tools for this, but I had to resort to some deft skillsaw work. And without a working wood chisel, I was sadly using a flat head screwdriver. Embarrassing. But it worked reasonably well.
Next, I assembled the walls on the floor of the barn, and then awkwardly personhandled them solo into place in the boat. Every connection was adhered with construction adhesive and nailed.
In the boat, the wall framing was glued and screwed.
Two walls.
Three.
With window framing and blocking added.
And finally four finished walls. In this last photo, you can see the doorframe to the head on the right.
A big day, for sure. Time for a cigar. Next up, more mistakes were made.



ue valve will be shut and the black valve will be open. This will direct the water to the main sump which will then direct the water to the 47 gallon holding tank I just built. When we can discharge gray water, the blue valve will be open, the black valve will be closed, and the shower sump will discharge overboard via the black pipe when the sump selector valve is in that mode. Its a pretty simple set up albeit a bit on the bulky side, but I made everything from parts found in the shop and did not have to depart with any cash. The elbow on he end of the manifold is for the guest cabin dressing room sink once I get that sink installed.
hese cabinets as the chase for the air conditioning duct that will feed the guest/kids cabin. That duct will be a four inch flexible pipe.
Once those jobs are finished, Im ready to start work on the sleeping room and its four bunks. Once the doors are installed and some finish on the wood, Ill post some more pics.
Im well into the finishing the wood work in the guest cabin ( kids cabin ), and Im feeling good regarding my schedule of having the wood work finished before the end of Spring. Since I do not need to do any welding regarding the pilot house install above this area of the boat, Im going to go ahead and install the ceiling, doors, and light fixtures before I start a new area on the boat. The pilot house is directly above the master cabin and bathroom, so I have to wait to install those ceilings until after I weld the pilot house to the boat deck.
between the lower and upper bunks after the 4" mattresses are installed will be 23". Each bunk will have its own reading light. I wired the guest cabin with an AC receptacle along with a coaxial receptacle on the bathroom wall so a TV could be installed. There will be three ceiling light fixtures in the guest cabin that will be controlled by one switch. Each of the reading lights for the bunks will have their own switch. All off the lights on the boat, along with the guest cabin lights, will be LED type fixtures.

now. Once Ive got the boat at the launch site, Ill give all the wood one more coat of Urethane. Ive still got quite a bit of work to do and it makes no sense to me to spend my time putting any more urethane on the wood as its going to get banged up. Theres enough protection on everything to get it through the rest of the build.
unk room, and a separate dressing area where the guest cabin sink resides. The time was now upon me to get all the water lines and drains lines installed for these areas.
he shower drains to a shower sump, then the gray water will be directed either over board, or to a holding tank in the aft section. Since the sink in the master cabin is amid ship, and I did not want a through hull fitting ( I only have one below the water line through hull fitting on board) for the sink, I decided to share the master cabin sink share the shower sump. I plumbed the master cabin sink into the shower sump with 1" flexible PVC.
ystem, Ill do so from this manifold. Since Ill have an air compressor on board, winterizing will be just a matter of opening manifold valves, and blowing all the lines out from one location.
line installed to transport waste to a black water tank if I decide to use a macerating type toilet.
wall vs mounted on the sink top. Ive never seen that type of valve before, and Im real happy with how it looks. I also like the look of the under mount sink. In regard to the under mount sink, there was quite a bit more size choices in a bar style vs a vanity style as long as one can live with the bar size sink strainer ( Im one of those folks who can live with bar style sink strainer).
inet style doors. They are what Id call frame and panel doors consisting of styles and rail pieces with a raised panel. These doors are overlay doors meaning the sit on top of the cabinets
fac
e frame vs a flush door that would fit within the face frame. Overlay doors are much easier to build and require a tenth of the precision t
hat flush doors require. The method of joinery Im using is called cope and stick. Basically one cuts a grooved profile in the panel side of all the styles and rails, then you cope the rail ( top and bottom horizontal pieces) to fit into that pr
ofile. The panel then floats in that frame you just created. Its a pretty nice looking door and adds a little more detail than one would get by using a flat plywood panel.
plywood for the panels. On the boat build, Ive decided to invest more of my time and build raised panels for all the cabinets ( well at least the cabinets in the master cabin and probably the galley). Because the raise panel is a solid wood panel, I had to build the doors to allow for seasonal movement of the panel. The air is pretty dry here now that we are in the late fall time, so if fit the panel on the loose side. I gave myself 1/4" gap all around the panel to allow the panel to "float" within the frame. I cut some pieces of 1/4" foam backer rod and stuffed the backer rod in to the groove of the style and rail before I assembled the door. The backer rod holds the panel centered in the frame while allowing it to expand and contract as humidity changes. After I get all the finish on the doors, I might go back and put a dab of glue in the center of the rail @ the center of the panel. Since wood expands across the grain, a little bit of glue at this location will allow th
e panel to expand while helping with any rattle I might get w
hen the door closes. If one would glue the panel tight all the way around the style and rail frame, it wouldnt be long before the expanding panel would destroy the frame. Before I assembled the doors I put a coat of finish on all the panels. If I didnt finish the panel prior to assembly, a line of unfinished wood would show up once the panel started to expand or contract. I clamped some boards to the edge of the work bench to help keep the doors square while I assembled them. I then checked the diagonals to assure the door was perfectly square before I clamped them.
ors stay shut. While the drawers have no pull hardware, Im thinking of installing some pulls on the doors.
y water needs to be held, the red handled ball valve is shut, the black handled ball valve is opened, and the sump pump selector valve is moved to the holding tank position, then all the gray water goes to the holding tank. If we can discharge gray water, the red handled ball valve is opened, the black handled ball valve is closed, and the sump selector valve is moved to the discharge position so all gray water is either pumped or gravity flow overboard.
ter.

There are four bunks in the guest cabin. Each bunk is 6 6" long with a minimum width of 24". The overall average ceiling height in the cabin is 6 8". Underneath the lower bunks are two cubby hole frame less storage spaces. Underneath the port side bunk Ive added a large drawer, and one more not so large cubby. The 45 gallon gray water holding tank is underneath the starboard lower bunk so no cabinets were able to be built in that space. Between the port and starboard bunks is another cubby on the same elevation as the other lower cubbies. E
ach set of bunks has a bulkhead. Because of the the standard bunk length and the left over space I had after laying out the bunks, I created a large blanket chest forward of the two lower bunks. The blanket chest is a huge storage space, and all the linens for the cabin will easily fit in this space. All the linens for the rest of the boat could also go in this space. The lid of the blanket chest serves as a step to gain access to the anchor chain locker when one needs to get in to that area. Since Im using a deck winch, I see the anchor chain locker becoming storage for one thing or another. To both port and starboard of the anchor chain locker, I created four more cubbies that are
behind the bulkhead of each of the upper bunks.